I am copying this from a blog post, and the thread is so long that this might not be seen, so I am posting it here.
This is the blog post:
http://markforster.squarespace.com/blog/2016/2/23/overcommitment-and-the-catch-all-list.htmlIn the blog, Mark Forster is reviewing the catch-all list.
And he gives these tips on avoiding overcommitment using a catch-all list.
1. Authorized Project List
2. Stringent evaluation of tasks before writing them down
3. Limit on the number of tasks on the list
4. Limit on the estimated time it will take to do the tasks on the list
31 July 2025 at 22:57 | Mark H.