I know all the troubles Catch-All systems have, but compared to the No-List systems the former systems have helped me do more things than the latter ones. So I decided to go back to one of the Catch-All systems that I recently drew inspiration from, AF4.
http://www.markforster.net/blog/2009/9/5/preliminary-instructions-for-autofocus-v-4.htmlI used AF4 continuously for months before, and I know its main weakness intimately, which was the longer you use it the greater items accumulate in the Active List, leaving less time and thus less pressure to do the Backlog. It just shows the main weakness of all Catch-All systems: the inevitable bloat of things to do. However, it seems that AF4's bloating is unbalanced in that the Active List can grow too much, which can overwhelm the Active List's task choosing protocol (to pass through the list only once) and leaving the Backlog's more robust task choosing protocol (going back to the Active List only if you go through the whole list from the beginning not choosing anything) under-utilized.
So I thought, why not tweak AF4 so that the task bloat is in the Backlog, not the Active List, but not to the point that the Backlog feels like an "Open List" (to use the terminology used years before)?
So here is the whole system with the tweak I thought of, borrowing heavily from the original AF4 instructions and using some ideas from DWM. Of course it is entirely possible that somebody else had thought of and used this tweak before, and if there are I would want to hear their experiences on it.
1 . Draw up your list of things to do with one task per line. (If you already have a list you can continue to use it). You don’t need to put everything on the list at this stage as you can add other tasks as and when you think of them.
2. Draw a line at the end of the list, and write the date seven days into the future to the right. Everything before this line is known as the Backlog. As you think of new tasks add them after the line. Everything after the line is known as the Active List.
(NOTE: If you are using an old list that is quite long, you may want to draw the line somewhere two-thirds to three-fourths down your list. You will see why later.)
3. You start with the Backlog. Look through the tasks in the Backlog in order and work on any tasks which feel ready to be done. Delete each task when you feel you have worked on it for long enough, and re-enter it at the end of the Active List if you need to do more work on it.
4. When you come to the line, do not go into the Active List. Instead return to the beginning of the Backlog and continue to move through it in it doing any tasks which feel ready to be done. Keep circulating in this way, until you have done a complete pass through the Backlog without any tasks being done.
5. You now cross the line into the Active List. Move through the Active List in order working on any tasks which feel ready to be done.
6. When you reach the last task on the list, you then go back to the beginning of the Backlog and repeat the process from Step 3 until the end of the day.
7. At the beginning of the new day, close again the list by drawing a line at the end of the list, and write the date seven days into the future to the right. Everything before this line is the new Backlog, and everything after this new line is the new Active Log. You may mark the old line with a symbol like x's to avoid confusion. Also, dismiss all the undone tasks above the old line that is dated the same date as today by drawing a diagonal line over the section/s. Go back to Step 3.