-
SF admits 5 speeds of operation for tasks.
Now(1min) - just do it.
Urgent(1h)- enter C2, do it before turning page
Soon (1d) - enter last page, do when you arrive
Near Future (1w)- enter last page, do sometime before page is dismissed
Medium Future. (1mo) - enter last page, let it be dismissed, resurrect upon a future review
parked (Never) - enter whereever, delete any time.
Also for recurring tasks and big tasks, you can work them at any of the above frequencies, with the C2 option allowing a task to be picked up hourly for a while then set aside for a day or so.
24 March 2011 at 23:22 | Alan Baljeu
-
This analysis stands in marked contrast to Mark's tips. This analysis eliminates the "unfinished" criterion and uses only the "urgent" criterion.
I am sympathetic to this presentation of the system.
From my short experience, and from reading Mark's commentary, "unfinished" does not appear to be the most appropriate description of what makes something C2-worthy. To use a transportation analogy, C2 is for items that I want to remove from the local track and put on the express track.
My only quibble with your 5 speeds is over "now." There are many good reasons to write things down. Maybe the cutoff should be a lot shorter than 1 minute. Fifteen seconds?
25 March 2011 at 2:29 | moises
-
It's a given that unfinished work will be resumed every time you turn the page. As I wrote above, that's about hourly. "Express track" is an apt phrase. The time scales are all mnemonic, and approximate. So 15 seconds is a fair substitute for 1 minute.
One notable point of the above is that SF is not a good place for things you want to do summertime, unless you're in the mode of planning your summer activities. I deem the dismissed pages ought to be cleared out by the time they get a month old. So where do these go? Perhaps it's not a problem.
25 March 2011 at 20:05 | Alan Baljeu