-
Anyone tried implementing SuperFocus electronically yet?
I'm using MyLifeOrganized (Desktop + Blackberry). I've been trying out a few different ideas over the past few days but I don't feel I've reached a comfortable software-based approach yet.
17 November 2010 at 13:53 | Frank
-
I'm not going to try. I did AF1 for a while on paper and then tried to do it electronically. While functionally I could get it to work (setting different lists as pages and being able to see crossed out tasks were the main technological hurdles) I found that you really lose something doing AF1 without a notebook, and I imagine it would be the same with Superfocus.
I have implemented and am using AF4 on the computer (using Toodledo) and it has worked well. I incorporated the three task add-on method last week and it has been superb.
But, I believe that AF1 and any supercharged version thereof loses its power when not done on physical paper.
17 November 2010 at 15:48 | Vegheadjones
-
<< Anyone tried implementing SuperFocus electronically yet? >>
I'm currently on DWM.xls by Walter, who also did make AF1.xls. I've requested a copy of that to start implementing SAF on. Though, I am secretly hoping he is quietly making AF1-SAF.xls or similar. ;-)
18 November 2010 at 13:56 | sabre23t
-
Might I suggest MS Word? Create a table with 1 row and 2 columns, and just go! Start a new table row when the page is full. There's a button to cross out text, and it's easy to copy and paste stuff around.
Or plain Excel also works, if you limit the number of rows.
Or OneNote. Anything freeform.
But I can't see task management systems doing very well for this, because SAF has a unique structure and they all have a different structure.
18 November 2010 at 18:36 | Alan Baljeu
-
<<I'm currently on DWM.xls by Walter, who also did make AF1.xls. I've requested a copy of that to start implementing SAF on. Though, I am secretly hoping he is quietly making AF1-SAF.xls or similar. ;-)>>
Hear! Hear! I was just about to start a thread called "Where's Wally?" for this very same reason. Find it hard to contemplate manual SAF after getting nicely hooked on his user-friendly digital DWM.xls.
WE NEED YOU WALTER! At least some of us do.
18 November 2010 at 22:39 | Robina
-
I've thought about this some. I think whatever you did for DWM or AF1 may work. Mostly, the two-column aspect of SAF isn't very important. What matters is that you can add tasks in two places: the current page and the last page, and that you have a way to decide a page is full, or you need to start a new page. And you need the ability to add tasks on any page.
So just have multiple groups for your tasks, and always add tasks to either the current group or the last one. In a calendar system(but doing SAF), add to the active date or the newest open date. Just ignore the dates.
And remember to stop adding new things to the last group when it's "half-full".
21 November 2010 at 17:42 | Alan Baljeu
-
I find Outlook tasks seems to work fine. I cripple it by using due date to refer only to the page of the "notebook" and use the "importance" flag to indicate a column 2 task (flagged as "low")
21 November 2010 at 18:24 | Will
-
<< I've thought about this some. I think whatever you did for DWM or AF1 may work. Mostly, the two-column aspect of SAF isn't very important>>
Thanks Alan. That is a very helpful analysis of the essence of SAF
24 November 2010 at 9:19 | Frank
-
Taskpaper might work well. There was a lot of discussion back in the day with a lot of folks loving it for AF1--it's very paper-like. I think you could easily fake the second column, by adding a new heading and using Project View, which shows all our top headings...
25 November 2010 at 2:54 | DS
-
Focuspad by Tony should work (
http://7actionsdev.com/focuspad/). I implemented it by adding a task called '==================' to the end of each page which separates column 1 from column 2. Simple as that.
29 November 2010 at 23:19 | Tijl Kindt
-
Tijl, could you possibly elaborate on your comment about using FocusPad for SuperFocus? I tried your example, but can't get it working -- it's easy enough to turn on the "long list" option so that each list can hold up to 21 items, and you can add a dividing line by entering "----" or similar onto the list to separate the two columns as you suggested, but it looks to me that FocusPad won't let you start a new page until the current page is completely full. Simply adding a divider won't let you create a new page when the current page is half-full (leaving room for the second column).
What have I done wrong? It looks to me that you can add separate "pads" to represent the various pages, but then you can't flick between them. I'd like to have separate half-full pages with two columns as you suggest.
Any pointers? You obviously got it working, so I must be missing something obvious. Thanks in advance...
30 November 2010 at 16:56 | Kiwi Erik
-
Sorry for the late reply.
I have my pad set as fixed length (25 items). Whenever I notice that a new page has been started I go back to the previous page and add a line ('=======') by tapping the '+' row at the bottom which basically draws the line between the left and right colums of that page. When I then want to add a task to the second column, I tap the '+' row again, which will add a task to the curren page *provided* that you have this option enabled in the application settings.
If tapping the '+' row adds a task to the last page instead of the current page, that option may be disabled or it may be a bug. It wasn't working for me at some point and then it suddenly started working again. I haven't been able to reproduce it.
If you have any further questions, let me know. I'm using the latest beta version by the way (beta 12).
2 December 2010 at 23:41 | Tijl Kindt
-
Any OmniFocus users using OmniFocus for SuperFocus? Any tips?
3 December 2010 at 22:23 | DS