Real Autofocus?
19 July 2017 at 15:37French translation by Fred Mikusek
This method of dealing with a task list is the most effective I have yet found. It is based on simple scanning, that is to say going round and round the list doing tasks as and when they stand out.
This is in itself quite an effective method, but as I said here it suffers from two major related problems:
- The list tends to grow uncontrollably
- It gets spread over a large number of pages if you are using a notebook and pencil/pen.
So what one ends up with is a huge backlog of tasks, which one doesn’t have a hope of ever clearing.
What is needed is a way of getting the list to self-limit in such a way that it focuses on what one can actually do within a couple of days or so.
Here’s how it works step-by-step. I’ve assumed you are using paper and pen/pencil, but it is easily adapted to work electronically.
FIRST DAY
- Start a new list. Don’t use an existing list.This is very important, otherwise you will overwhelm it before you’ve even started.
- Add other tasks to the end of the list as needed or as they occur to you throughout the day. Allow the list to build up gradually.
- Work the list by scanning it, taking action on those tasks that feel ready to be worked on.
- When you’ve worked enough on a task. cross it out. If it’s unfinished, re-write it at the end of the list. Do the same with tasks that will recur the same day or the next day.
- When you finish for the day draw a short horizontal line in the margin immediately after the last task on the list.
SECOND DAY
- Starting from the beginning of the list work as in rules 2-5 for the First Day.
SUBSEQUENT DAYS
- Extend the first of the two short line end-of-day markers (see rule 5) so that it goes right across the page.
- Start working from that line (i.e. ignore any tasks before it for the time being)
- When you reach the end of the list, go back to the beginning of the list.
- You now work only on the tasks between the beginning of the active list and the long horizontal line you drew at the beginning of the day:
- Scan them and DELETE any you no longer want to do at all
- Scan again and DEFER any you don’t want to do now to your schedule/calendar (do not just re-write them at the end of the list without taking any action on them)
- DO all the remaining tasks in order
- Continue working the rest of the list as in rules 2-5 for the first day.
IN SUMMARY, at the beginning of each day you work on yesterday’s tasks in the normal way, followed by today’s tasks. Then you clear ALL tasks remaining from the day before yesterday (DELETE, DEFER or DO). Once you’ve done that you carry on working yesterday and today’s tasks as normal.
Using this myself I was surprised how few tasks I needed to delete or defer. The list seemed to conform almost automatically to the amount of time I had available. I’ll be interested to know if it works that way for you too.
Comments
- <<SECOND DAY
Starting from the beginning of the list work as in rules 3-6 for the First Day.>>
Shoudn't it be: .... as in rules 3-5 for the First Day?19 July 2017 at 18:26 | nick61 - Thanks Mark. You are the best. I have been checking hourly for a couple of days for this to show up.
This sounds quite promising - giving it a try now.19 July 2017 at 18:32 | Eric - Would this work in a daily planner? I'm at the point where keeping a daily appointment book could work better for me, & it would be nice to integrate tasks like DWM did. That was the version that worked best for me in the past, but between how spread out the list got & not having many appointments I quit using a daily planner.19 July 2017 at 18:41 | Jessica
- <<Shoudn't it be: .... as in rules 3-5 for the First Day?>>
Or 2-5?19 July 2017 at 19:30 | Gadgets - Quick question:
What happens if work on or finish the task from step 5 on day 2? Does day 2 become the new day 1?19 July 2017 at 19:41 | David Coyer - In addition to DO, DELETE, DEFER, isn't there some justification for further option? I'm thinking of of what Alan Lakein calls the 'CZ' list. If you can't bring yourself to work on a task, but don't want to completely forget about it forever, you'd dump it there, and check it once a month, or whatever.
This is, of course DEFERRAL, but of an indefinite sort.19 July 2017 at 20:30 | Martin Williams - nick61 and gadgets:
Sorry, i removed an unnecessary rule and forgot to renumber the reference. It should be 2-5. I will correct.19 July 2017 at 22:22 | Mark Forster - Martin Williams:
<< If you can't bring yourself to work on a task, but don't want to completely forget about it forever, you'd dump it there, and check it once a month, or whatever.>>
I suspect all you'd succeed in doing is creating a huge list of stuff you're never going to get round to. Exactly what this method is intended to avoid.19 July 2017 at 22:29 | Mark Forster - Jessica:
<< Would this work in a daily planner? >>
I don't see why not. Why don't you try it out and report back?19 July 2017 at 22:32 | Mark Forster - David Coyer:
<< What happens if work on or finish the task from step 5 on day 2? Does day 2 become the new day 1? >>
That's actually happened to me a couple of times during the testing.
At the beginning of the day you work on yesterday’s tasks in the normal way, followed by today’s tasks. Then, since there's nothing left over from the day before yesterday, you just carry on working yesterday and today’s tasks.19 July 2017 at 22:37 | Mark Forster - For the final task under SUBSEQUENT DAYS, "DO all the remaining tasks in order" - did you find it important that they be done "in order"?19 July 2017 at 22:44 | Zane
- Again on "Do all the remaining tasks in order."
Does "do" mean "do some work on"?
Thank you so much for this new method!19 July 2017 at 23:25 | Laby - Zane:
<< did you find it important that they be done "in order"? >>
I tried various ways of doing this. I found that that the knowledge that one was going to DO the tasks in order gave an overall greater sense of purpose which even affected the DELETE and DEFER stages.19 July 2017 at 23:26 | Mark Forster - Laby:
Yes. It means that throughout the instructions19 July 2017 at 23:27 | Mark Forster - I think this is an excellent idea, especially the way you've nailed the problem of uncontrolled growth in a simple way.
I do have another stupid question: Would you limit the contents of this catchall to actionable tasks, or would you also throw non-actionable things at it like ideas, new project possibilities, etc.?19 July 2017 at 23:32 | Martin Williams - Martin Williams:
<< I think this is an excellent idea, especially the way you've nailed the problem of uncontrolled growth in a simple way. >>
The thing I wasn't expecting about this method was that it seems to have a psychological effect on my mind so that I'm much more aware of how much is a realistic amount I can put on the list and get it all done.
<< I do have another stupid question: Would you limit the contents of this catchall to actionable tasks, or would you also throw non-actionable things at it like ideas, new project possibilities, etc.? >>
Thinking is the most important part of action - so yes I'd include them.19 July 2017 at 23:42 | Mark Forster - Of all Mark's systems, this one has the coolest acronym. :-)
I'm going to try it today!20 July 2017 at 0:06 | Seraphim - "Once you’ve done that you carry on working yesterday and today’s tasks as normal"
This is basically an everyday loop?
Also, wouldn't it be great to use this with a daily journal on Evernote for example? And then use checkboxes are for the tasks. You'll review the previous day's journal entry, and the day before that, daily.20 July 2017 at 1:48 | Yoyorast - Remarkably this innovation is extremely similar to what I just read earlier today in "18 minutes" by Peter Bergman. (Highly recommend the book, time management is the subject, but the Todo list is a tiny part of his writing.). Allow me to quote from chapter 25, "The three day rule":
[After filling out today's schedule from items on the the todo list] I review what's left on the list. If there are new items from today or the previous two days, I leave them.... But for everything else..., I do one of four things:
1. Do it immediately [most leftover things get finished in a flash once you actually start]
2. Schedule it [for a future date]
3. Let it go. [delete]
4. Someday/maybe. [the coward list for things you don't have the courage to fully delete]
Why did Peter add this rule? "...the probability — of a long list of items... And that list will simply grow longer and more stressful — a continued reminder of what you aren't accomplishing— day by day.... This is where the three-day rule comes in."20 July 2017 at 5:49 | Alan Baljeu - @Alan Baljeu - I like the parallel you draw between this system and the Bregman one.
Peter Bregman's 18 Minutes is indeed an excellent read. I think several principles in it complement Mark's system quite nicely, as it also provides some guidance on setting up areas of focus, which could then allow you to populate the to-do list in a way that is in alignment with goals/objectives you set out to achieve.
@Mark - Looking forward to testing your system, Mark! Thank you for sharing it with us, and I hope that you are well!20 July 2017 at 7:01 | Bernard - As usual from Mark, this is brilliant. It combines what I liked about AutoFocus (do things as they stand out) with what I liked about DIT (get a grip on what constitutes "a day's work"). Starting my testdrive today, looking forward to see how it works for me!20 July 2017 at 9:00 | Nicole
- How do you go about handling big goals with this20 July 2017 at 9:16 | Yoyorast
- When you defer a task to your calendar/schedule, how do you handle the task in practice when the scheduled day comes?
Do you actually schedule a block of time and use this time to work on the task? Or do you add the task to the end of the list on the scheduled day? Do you then force yourself to do at least some work on the task on this day?20 July 2017 at 9:53 | Christian - Yoyorast:
<< How do you go about handling big goals with this? >>
Every goal is made up of actions. This method is about handling actions. All the following are actions:
Plan
Think About
Discuss
Draft
Review
Research
Organize
And many other management type words20 July 2017 at 10:23 | Mark Forster - Christian:
<< When you defer a task to your calendar/schedule, how do you handle the task in practice when the scheduled day comes? >>
First I'd check that I still wanted to do the task at all. Then I'd put it on the list and handle it like any other task on the list.20 July 2017 at 10:27 | Mark Forster - Hi Mark,
[Looking forward to test driving this after the forthcoming hols]
Re <handling big goals>: would you keep a parallel overall projects list, or would you advise/prefer leaving these to the intuitive process of the list?20 July 2017 at 10:27 | Colin - Colin:
<< Re <handling big goals>: would you keep a parallel overall projects list, or would you advise/prefer leaving these to the intuitive process of the list? >>
I think it depends on your circumstances, Projects should be neither over-controlled nor under-controlled. So what suits one project won't suit another.20 July 2017 at 11:06 | Mark Forster - Alan Baljeu:
<< "The three day rule":>>
I've not read the book so I'm I'm probably missing a lot of background, but I'm not so sure that the resemblances are as great as they appear at first sight.
For a start Bergman refers to "filling out today's schedule from items on the the to-do list". I'm not sure what he means by that but it certainly doesn't sound like what I'm advocating in my method.
Secondly, mine is a "two day rule" by his definition, not a three day rule
Thirdly he goes for do, defer, delete. I go for delete, defer, do. This is important psychologically.
And fourthly, a someday/maybe list? Just exactly what I'm trying to get away from!20 July 2017 at 11:23 | Mark Forster - The similarly between Bregmanns "3-day-rule" and Marks new system are in my opinion a perfect example that two experts, who are dedicated to the same topic, come to similar conclusions, without even knowing about each others work. Kudos to both experts.20 July 2017 at 11:40 | Nordwind
- In the end, you'll have a really long list with stuff you've completed, and it'll grow and grow (digital, using something like evernote). Is this the goal?20 July 2017 at 12:02 | Yoyorast
- @Yoyorast: As long as you do any of the tasks on your todo-list and not just stare at them, this is what inevitably will happen - no matter which method you use. But what prevents you from archiving/deleting old pages, on which no unactioned tasks are left?20 July 2017 at 12:29 | Nordwind
- @Nordwind, I already know what sets this apart from any other todolist or system.
I was talking about this "It gets spread over a large number of pages".
Say you've used this for a week, you'll be able to go back and view tasks you've completed right? And since you're deleting, deferring, or doing items from -2 days, there won't be any unactioned tasks.
And if you're doing this electronically, you might have one massive list in which you can view all tasks you've done right? And stuff won't be split up through pages like in a notebook.20 July 2017 at 12:53 | Yoyorast - @Yoyorast: Why don't you use one Evernote note for every day, in which you write down only the tasks of this day? In this case you'll only have three active pages.20 July 2017 at 12:58 | Nordwind
- Question - On day three - you start at the line and work towards the end. Do you just evaluate each task in order and decide if it is ready to be done? Or do you scan around over and over again until there is nothing left to be done before moving to the other side of the line?
I am unclear as to what process gets you to the end of the list so that you can move to the beginning of the active list (other side of the line)
Thanks,20 July 2017 at 14:30 | Eric - Eric - here's my own little cheatsheet with points I especially need to remember. If it's incorrect someone can correct me:
...at the beginning of each day you start by working on yesterday’s tasks in the normal way (work the list by scanning it), followed by today’s tasks (work it by scanning). Then you clear ALL tasks remaining from the day before yesterday (DELETE then DEFER then DO, in order). Once you’ve done that you carry on working yesterday's and today’s tasks as normal.20 July 2017 at 15:06 | Zane - Hi Zane,
You wrote:
"working on yesterday’s tasks in the normal way (work the list by scanning it), followed by today’s tasks (work it by scanning)."
I don't think you separate the two days and scan each separately, but work on them as one list, scanning through.20 July 2017 at 15:41 | vegheadjones - Yoyorast:
<< In the end, you'll have a really long list with stuff you've completed, and it'll grow and grow (digital, using something like evernote). Is this the goal? >>
I'm not quite sure what you're getting at. Are you saying that this would be a good thing or a bad thing?
Either way, if you want to keep them for reference you can, or if you want to get rid of them you can because there are no unactioned tasks left on them.
When I mentioned "gets spread over a large number of pages" in the instructions, I was referring to unactioned tasks, not completed tasks.20 July 2017 at 15:53 | Mark Forster - Eric:
<< On day three - you start at the line and work towards the end. Do you just evaluate each task in order and decide if it is ready to be done? >>
Yes, though "evaluate" is too strong a word. You scan rapidly through the list and only stop when a task stands out as being ready to be done.
<< Or do you scan around over and over again until there is nothing left to be done before moving to the other side of the line? >>
No, you do one pass through Yesterday and Today (treated as one), then you go back to the Day Before Yesterday at the beginning of the list and clear it using Delete, Defer, Do. Once it's clear, you circle through Yesterday and Today (treated as one) for the rest of the day.20 July 2017 at 16:08 | Mark Forster - Good catch vegheadjones. Thanks!20 July 2017 at 16:41 | Zane
- The process for the oldest tasks seems to be the most different from the dismissal process on other methods. Instead of automatically deleting or deferring the oldest chunk, or giving them a last chance to be done before deleting, you are considering each task individually for deletion, then the remaining ones for deferral, and then doing the rest. Also, the tasks are not allowed to get stale.
At first it seems like it would be more efficient to consider "delete, defer, do" on each task, but that is a different mental process than the one Mark recommends. Why would it make that much difference?20 July 2017 at 16:59 | Jessica - Mark, been trying your systems here, thanks for all your effort and sharing.
what do you suggest based on your experiences, do the list with pen and notebook or digitally?
thanks, thanks, alot
:)20 July 2017 at 17:01 | Nanda - Jessica:
"delete, defer, do" _is_ what I recommend.
The reason I chose that order is because deleting or deferring a task takes exactly the same effort regardless of the difficulty of the task, whereas doing a task takes more effort for a difficult task than it does for an easy task.
Therefore if you delete and defer first you are more likely to get a answers uninfluenced by the difficulty of the task. The tasks left to be done will be the ones that should be done.
If you put doing first, then your decision will be effected by the difficulty of the task. This will result in some tasks being done just because they are easy and others being deleted or deferred just because they are difficult.20 July 2017 at 17:41 | Mark Forster - Nanda:
<< do the list with pen and notebook or digitally? >>
This is very much a personal preference. My preference is for paper and pencil except where I am likely to have to do a lot of re-arranging.
And yes I do use a pencil - a Kuru Toga to be precise.20 July 2017 at 17:47 | Mark Forster - Hi Mark
Thanks a lot for sharing your new system with us, I tried it today and it was great as all the tasks are fresh to me and I am quite motivated to work on the system.
However I have a question, are you seperating your list with work and non-work list? For example, I have a daily routine task "Cleaning my office table", which I will do it daily on my work day Monday to Friday. However on Saturday and Sunday, I will not go to office, therefore "Cleaning my office table" will be left on the list until Sunday. Such "Cleaning my office table" task will undergo the progress of "delete, defer and do" on Sunday, in this case, shall I defer such task to calendar on Monday and add back to the list?20 July 2017 at 18:12 | ellie520 - I think was you suggest for the oldest tasks is to ask:
Delete? for the oldest tasks
--Task A--
Task B
Task D
Task Z
...
Defer? for the remaining tasks of this list
Task B
Task D-->
Task Z
....
And then Do what is left
Task B
Task Z
As opposed to asking 3 questions of every task in that group:
Delete, Defer, Do?
Task A
Delete, defer, do?
Task B
Delete, defer, do?
Task D
....
Was I interpreting the instructions incorrectly?20 July 2017 at 18:25 | Jessica - Mark:
<No, you do one pass through Yesterday and Today (treated as one), then you go back to the Day Before Yesterday at the beginning of the list and clear it using Delete, Defer, Do. Once it's clear, you circle through Yesterday and Today (treated as one) for the rest of the day. >
Do you always scan beginning to end of whatever section you are in? and then return to the beginning? I think this what you mean by circling - but not sure.20 July 2017 at 19:30 | Eric - I quickly found myself moving over to OneNote to implement this. Here is a screen shot:
http://www.evernote.com/l/ADhCDClmshRGqY7TXghNPlHAE40ybFthHTM/
I use three sections:
- Today (all new and re-entered tasks)
- Yesterday
- Delete Defer Do
Tasks are represented by Pages in OneNote.
At beginning of day:
- Move all pages from Yesterday to Delete Defer Do
- Move all pages from Today to Yesterday
- Start working in the Yesterday section
- Then move to the Today section
- Then move to the Delete Defer Do section (and follow the rules that Mark described). (The first time I do this will be tomorrow.)
- Then cycle through Yesterday and Today as described by the rules20 July 2017 at 21:57 | Seraphim - ellie520:
<< However I have a question, are you seperating your list with work and non-work list? >>
I can't give individual advice on how to deal with work v. non-work tasks because it differs so much from person to person. However my standard advice is to have a separate list for each location. In your case one of these would presumably be working on a 5-day basis.20 July 2017 at 22:16 | Mark Forster - Jessica:
<< Was I interpreting the instructions incorrectly? >>
No, you interpreted it correctly.20 July 2017 at 22:21 | Mark Forster - Seraphim:
<< I quickly found myself moving over to OneNote to implement this >>
Being an Evernote man I've never been able to understand how OneNote works. But if I were doing this in Evernote, I would have all the tasks in a single note with a marker between each day.
Or alternatively I would use a note with a 3-column box and just delete the left-hand column and add a new blank right-hand column each day. Dead easy.
Whichever I used I would give all the tasks a tick-box.
And I wouldn't need to switch to the rival program if I wanted to post a screen shot !20 July 2017 at 22:43 | Mark Forster - Eric (and all)
<< Do you always scan beginning to end of whatever section you are in? and then return to the beginning? I think this what you mean by circling - but not sure. >>
I've added an extra rule to the end of the instructions to make it clearer what I mean.20 July 2017 at 22:50 | Mark Forster - Mark wrote:
<< And I wouldn't need to switch to the rival program if I wanted to post a screen shot ! >>
LOL! I use OneNote at work, the desktop version. And Evernote for sharing stuff online. OneNote's cloud solution is getting better, I hear, but I'm not using it yet.
When I'm working on paper, I tend to capture each task as a few words on the line in the notebook.
But when I'm working electronically, I tend to treat larger objects as tasks.
E.g., if there's a longer email I need to digest and extract the actions, I'll just count the whole email as a task. I throw the email into OneNote, which creates a "page" for it. I could do the same for Evernote, where it would create a whole new Note.
Another example is meeting minutes, with a bunch of action items embedded within. I'd treat the whole page of meeting minutes as a single task (which would likely get worked little-and-often till all the actions are done).
A "page" can also consist of a single word, like "email", and many of my recurring tasks are written that way.
If I end up breaking out my personal stuff into a separate list, and I go electronic, I'd probably do it in Evernote, and set it up something like this:
- Notebook for Today
- Notebook for Yesterday
- Notebook for Delete Defer Do
I'd then set my default notebook for new items to the Today notebook.
Everything I throw into Evernote would then show up as a Note in Today, and each such Note would represent a task.
Sorting by Modified Date would then get re-entered items sorted correctly.
But all of this reflects my own idiosyncratic way of working -- I could see how your checklist approach would be very effective if you express your tasks electronically as a few words of text as one would do on paper.20 July 2017 at 23:07 | Seraphim - It surprises me that anyone would find OneNote confusing. I find Evernote puzzling because it doesn't appear to structure anything and I never get the hang of using a tag system.
OneNote meanwhile is nothing other than a 4-ring binder with tabs (labelling the sections and pages). If you understand a binder with sections, that's all you need to understand OneNote. There's no tagging or indexing or sorting, just pages. Now using one page per task in a todo list is unique but it works because the tabs make all the items visible at once down the side of your binder. And then you get the advantage of keeping details with your task.21 July 2017 at 2:05 | Alan Baljeu - << Now using one page per task in a todo list is unique but it works because the tabs make all the items visible at once down the side of your binder. And then you get the advantage of keeping details with your task. >>
Yes, exactly!! :-)21 July 2017 at 6:42 | Seraphim - I have some doubts about what scanning means exactly:
First day, rule 3: <<Work the list by scanning it, taking action on those tasks that feel ready to be worked on.>>
Does it mean:
- I go through the list until I find FIRST task which is standing out and do some action on it and then I go back to the following/next task and continue scanning?
- Or I quickly scan all the tasks in the list and then, second time, I go through the list more carefully, waiting for what stands out or comparing more tasks which stands out? (Autofocus-like?)
- Or I can take scanning more liberally, going up, down, back up, scanning somehow chaotically until something stands out? (of course, apart from situation when the rules say that I should scan just once (beginning of the day: yesterday-today) or do tasks in order (delete-defer-do section).
Thanks a lot.21 July 2017 at 7:47 | Daneb - Seraphim,
How do you flag completed tasks? simply delete them?
If I were to go virtual, I'd probably use Outlook Tasks ( I live in Outlook), with date based views on current and old tasks.
http://hpe-my.sharepoint.com/personal/will_ross_hpe_com/_layouts/15/guestaccess.aspx?guestaccesstoken=j3R9uwkTKmJ2yhW7IAw8NkN081JzE4UcGlZHU%2bi7Yn8%3d&docid=2_0834e56f6060f44b3848eff4117a62734&rev=1 Not sure if that link will survive the company firewall. If not, and anyone is interested, let me know.21 July 2017 at 10:45 | Will - Seraphim:
<< I could see how your checklist approach would be very effective if you express your tasks electronically as a few words of text as one would do on paper. >>
Although I don't use it myself (preferring the simplicity of paper and pencil) it's easy enough in Evernote to link a task to a document such as an email or meeting minutes. Or you can group any collection of documents together and link the lot to a task. And you can link the same document to more than one task.
And you can add check boxes within documents so you don't miss any action points.21 July 2017 at 11:21 | Mark Forster - Alun Baljeu:
<< OneNote meanwhile is nothing other than a 4-ring binder with tabs (labelling the sections and pages). If you understand a binder with sections, that's all you need to understand OneNote. There's no tagging or indexing or sorting, just pages. >>
I'd find that far too restrictive. The great advantage of Evernote is that is that you can organize things any way you like, different things in different ways, or even the same things in different ways at the same time.21 July 2017 at 11:46 | Mark Forster - Daneb:
<<I have some doubts about what scanning means exactly:>>
The first paragraph of the instructions defines scanning:
"This method of dealing with a task list is the most effective I have yet found. It is based on simple scanning, that is to say going round and round the list doing tasks as and when they stand out."
<< Does it mean:
<< - I go through the list until I find FIRST task which is standing out and do some action on it >>
You go through the list until you come to a task which stands out and take some action on it.
<< and then I go back to the following/next task and continue scanning? >>
You continue scanning in the same direction.
<< - Or I quickly scan all the tasks in the list and then, second time, I go through the list more carefully, waiting for what stands out or comparing more tasks which stands out? (Autofocus-like?) >>
You just go round and round the list doing tasks as and when they stand out. Leave it up to the "standing out" process to decide how many tasks to do on each pass.
<< - Or I can take scanning more liberally, going up, down, back up, scanning somehow chaotically until something stands out? >>
No.
<< (of course, apart from situation when the rules say that I should scan just once (beginning of the day: yesterday-today) or do tasks in order (delete-defer-do section). >>
Yes.21 July 2017 at 12:07 | Mark Forster - Will:
<< Not sure if that link will survive the company firewall. If not, and anyone is interested, let me know. >>
It's asking for email/phone and password.21 July 2017 at 12:37 | Mark Forster - Hi,
i implemented this in Outlook Tasks, grouping by start date and sorted by created date. To reenter a task it is best to copy it (Right click drag to the Tasks list on the bottom left) and check off the old task to give it a new "date created."
Seraphim, I used to use onenote for tasks but now find it to use the outlook flag in one note to move to do items to Outlook.
Alan and Mark: OneNote is more like a binder than evernote, but there are a lot of non-binder like features, including tagging and linking that makes it (in my opinion) as powerful as Evernote21 July 2017 at 14:17 | vegheadjones - I started my new Real Autofocus list on Tuesday afternoon. The notebook I am currently using has 26 lines per page. I just finished the DELETE, DEFER, DO process for the day before yesterday's tasks. The outstanding tasks by page are:
1 - 0
2 - 0
3 - 13
4 - 13
5 - 16
6 - 1 (only task on page)
So far I have taken action on 88 tasks and I have 43 tasks remaining.
This week is very busy for me, with one very large project due by end of day Saturday and lots of appointments on my calendar the past couple of days and between now and then.
I feel like I am going to make it with this method. I feel like I know what to say No to including requests from others I need to defer to next week.21 July 2017 at 15:26 | Stuart Tattum - vegheadjones:
<< OneNote is more like a binder than evernote, but there are a lot of non-binder like features, including tagging and linking that makes it (in my opinion) as powerful as Evernote >>
It's actually been a very long time since I've looked at OneNote so I'm sure it's got many more features now. But from what Seraphim was saying the one area it still falls down in is synchronizing across platforms. I would find it very difficult to do without that.21 July 2017 at 17:24 | Mark Forster - @ellie520: (dealing with work tasks during weekend)
- One way is having two separate lists as Mark suggested.
- Another way: On Sunday, copy (only the) Friday WORK tasks to today (=Sunday) list. With NON-WORK Friday tasks, deal normally via delete-defer-do. So the alternate sequence would be copy(work)-delete-defer-do(non-work). On Sunday you will probably not do any work tasks (which you put on today=Sunday list) but on Monday, they will be appropriately on "yesterday" list, which is what you want.
- Another alternative would be - on Sunday, deal with Friday tasks as: ignore (work-tasks) -delete-defer-do(non-work tasks). Mark ignored tasks somehow if you need. But there is no need as they are tasks which stayed uncompleted/unmoved in Friday list. On Monday, deal with them as part of yesterday (Sunday) list. On Tuesday, deal with them also as part of Sunday list (delete-defer-do). You can make a note in Sunday list so as not to forget.
This are of course two untried ideas, I will test them during this weekend as I want to mix work and non-work items in one list (I am working mainly from home) but I do not usually want to work during weekends.21 July 2017 at 19:45 | Daneb - (continuation of previous comment) Sorry for confusion, I did not realize that on Saturday, I will also have to deal with work tasks (Thursday delete-defer-do). I will do the same as suggested in both alternatives - either move them to Saturday list (but not working on them) or ignore (mark) them on Thursday list and on Monday I will consider them together with Saturday tasks (delete-defer-do).21 July 2017 at 20:10 | Daneb
- ellie520 and daneb:
I am anticipating that handling Work tasks over the weekend will be relatively simple. Any Work tasks from Thursday that I still want to do and don't have to do tomorrow will be deferred to Monday or another day next week when I DELETE, DEFER, DO tomorrow (Saturday). During the day tomorrow when I scan the list I assume I won't feel like doing any or most work tasks from today (Friday), they won't stand out to me. When I DELETE, DEFER, DO on Sunday any Work tasks from Friday will be deferred to Monday or another day next week unless I feel I need to work on any of them.21 July 2017 at 22:16 | Stuart Tattum - If I were going to do one list for both work (5 day week) and personal (7-day week), I think the way I'd do it would be the stalagmite/stalactite method, For those of you don't know what this is, you write personal tasks from the top of the page downwards and work tasks from the bottom of the page upwards (or vice versa). When they meet you delineate the boundary with some sort of distinctive marking.
On Saturday and Sunday you would just ignore any tasks on the Work side of the boundary and pick them up on Monday as if the weekend hadn't existed. Nothing difficult about that at all.
You aren't restricted to weekends either. Any days off work can be treated the same way.
What's more, it will work the other way round on those occasions when you are away from home on a work trip and can't do any personal stuff.22 July 2017 at 1:15 | Mark Forster - Clearing all tasks remaining from the day before yesterday reminds me the lizard dropping tail. Brilliant!22 July 2017 at 7:38 | Shamil
- Thanks a lot for sharing this.
I made a quick translation in French of this very interesting article.
http://fmblg.blogspot.fr/2017/07/real-autofocus-nouvelle-methode-de.html
If You speak French, tell me what You think.22 July 2017 at 9:22 | fredm - fredm:
Thanks for this. I'll put a link to it if I may. One thing you've missed is that i've added a new paragraph 5 to SUBSEQUENT DAYS. Otherwise it looks fine to me.
I particularly like that you've added quite a lot of points from the Comments. In fact I like it so much that I might have to translate them back into English and add them to the article!22 July 2017 at 12:25 | Mark Forster - I have question,
Ive been ini third day using this system.
1. I've done scanning from yesterday tasks and today tasks
2. Now im scanning day before yesterday tasks, with DELETE, DEFFER, DO
3. looks like i cannot finish do all tasks in DO, because wait for someone tonight
My question: should i scan yesterday and today tasks before finish all DELETE, DEFFER, DO process?
Or you must must DELETE, DEFFER, DO process before you move next scan yesterday and today tasks?
Thanks, Mark22 July 2017 at 12:33 | Nanda - What an interesting system. I'm on my third day on this system, so the Delete-Defer-Do step has kicked in....and I can see how powerful this is. It keeps you focused on your current priorities. So far, I love it.22 July 2017 at 14:57 | Paul B
- Mark, your French link is broken.22 July 2017 at 15:27 | Alan Baljeu
- @Mark
Thanks for adding a link (but it should be http://fmblg.blogspot.fr/2017/07/real-autofocus-nouvelle-methode-de.html instead of http://markforster.squarespace.com/blog/2017/7/19/ss_temp_url (broken link)).
I have added a new paragraph 5 to SUBSEQUENT DAYS.
@Alan
Thanks for noticing the broken link.
@Nanda
If you run out of time, I suppose you do whatever you can about the tasks DO and then write then again at the end of the list. They will stand out tomorrow morning.22 July 2017 at 16:12 | fredm - Alan Baljeu:
<< your French link is broken. >>
Thanks. I don't know how that happened. Now fixed.22 July 2017 at 17:19 | Mark Forster - Nanda
That's an interesting question.
As I understand it, what has happened is that now you have reached Day 3 and are having to deal with the Day-Before-Yesterday's tasks for the first time. Your problem is that you have too many tasks left in that day to clear in the time available.
These tasks would be the ones still unactioned of those you entered into the system on Day 1.
This illustrates the importance of following my advice to let the list build up gradually and not to put everything in it at once.
What's the remedy?
You know approximately how much time you have available today. You need to re-scan the Day-Before-Yesterday's tasks and DELETE or DEFER enough tasks so you can DO the remainder in the time available. Make sure that the DEFERRED tasks are not all deferred to the same date, otherwise you will just have the same problem in a few days' time.22 July 2017 at 17:44 | Mark Forster - fredm:
<< I have added a new paragraph 5 to SUBSEQUENT DAYS. >>
Great!
<< If you run out of time, I suppose you do whatever you can about the tasks DO and then write then again at the end of the list. They will stand out tomorrow morning. >>
No, see my reply to Nanda above.22 July 2017 at 17:50 | Mark Forster - Mark,
As I understand it, what has happened is that now you have reached Day 3 and are having to deal with the Day-Before-Yesterday's tasks for the first time. Your problem is that you have too many tasks left in that day to clear in the time available.
Yes you are right. I put all my tasks in the system
What's the remedy?
Thanks for this, Mark.
Make sure that the DEFERRED tasks are not all deferred to the same date, otherwise you will just have the same problem in a few day's time.
Im deffering to days ahead right now, so glad you tell me this.
Once again, thank you very much22 July 2017 at 17:53 | Nanda - So how do you deal with semi-urgent stuff while you're in the "DO" phase of DELETE-DEFER-DO? The instructions say that you should finish everything from the day-before-yesterday before continuing to scan yesterday's and today's list, so just writing it at the end of the list will not really work. Even if you do only a little work on all DO-stuff from before yesterday it could take quite a while before you reach the end today's list.
I see several options:
* do urgent stuff as it shows up, just as in the original Autofocus (but that's tricky for semi-urgent things, when to decide if something is urgent enough to make you leave working the list).
* get in the habit of leaving as little as possible tasks on yesterday's list to avoid the problem altogether.
* start every day with a quick scan of yesterday's and today's list and immediately proceed to the tasks from before yesterday to get them cleared as early in the day as possible.
Mark, I assume you would advocate the second option? Any other suggestions?22 July 2017 at 18:01 | Nicole - Mark,
What are you using for deffering tasks? Is it some kind digital reminder (like phone's tasks, calendar) or are you using something like notebook diary?
What do you suggest?22 July 2017 at 18:41 | Nanda - Might be weird question, what if there's so many tasks from yesterday that you didn't get any done that are supposed to be done today? It says you should do yesterday's tasks first, then today's.
So far, it has been really great for me and has massively increased my productivity, I think.22 July 2017 at 23:16 | Yoyorast - Nicole:
<< Mark, I assume you would advocate the second option? >>
Yes, you're right. If you have so many tasks for DDD that you are worried about getting to semi-urgent tasks, then you have too many.
<< Any other suggestions? >>
The way to avoid having too many tasks for DDD is not to put too many tasks on the list in the first place.22 July 2017 at 23:22 | Mark Forster - Nanda:
<< What are you using for deffering tasks? Is it some kind digital reminder (like phone's tasks, calendar) or are you using something like notebook diary? >>
I have a digital calendar of my own design on Evernote, and I put tasks for specific days in the Comments column. I can access it on my desktop, my smartphone and any other computer in the world provided it has an internet connection. My wife has a link to the calendar and can see it on her laptop.22 July 2017 at 23:33 | Mark Forster - Yoyorast:
<< what if there's so many tasks from yesterday that you didn't get any done that are supposed to be done today? It says you should do yesterday's tasks first, then today's. >>
I think you have probably put too many tasks on your list. My advice is to start again with a fresh list. And this time pay close attention to what I saId in the instructions:
" 1. Start a new list. Don’t use an existing list.This is very important, otherwise you will overwhelm it before you’ve even started.
" 2. Add other tasks to the end of the list as needed or as they occur to you throughout the day. Allow the list to build up gradually."22 July 2017 at 23:43 | Mark Forster - Hi Mark, great new system!
I was wondering if you would be able to develop something, or expand this system for those who can't always clear the incoming tasks in a couple of days. I can see this system could create quite long lists of deferred tasks. A robust system to handle deferred tasks would be great...23 July 2017 at 8:41 | MrBacklog - MrBacklog:
<< I can see this system could create quite long lists of deferred tasks. >>
So can I!
In fact the whole idea of the system is to keep your workload down to what you can actually do. So a long list of deferred tasks is self-defeating.
<< A robust system to handle deferred tasks would be great. >>
I think the easiest way to handle this would be to put a low limit on the number of tasks that can be deferred to a particular day. So if the limit were three a day, and one day you had 15 tasks you wanted to defer, then you would have to spread those tasks over five days (more if some of those slots were already filled).23 July 2017 at 10:39 | Mark Forster - Thanks Mark, that will work nicely.
I can see the system is a bit like juggling 3 balls.
Yesterday tasks, today tasks and deferred tasks.
Take on too much at one time and you drop the balls. Get it right and a perfect system for getting everything done at the right time.
Lovely!23 July 2017 at 11:16 | MrBacklog - If using this with a with a notebook, do you just leave deferred tasks uncompleted behind the lines, and then review them later?23 July 2017 at 12:40 | Yoyorast
- Yoyorast:
No, when I defer a task I move it immediately off the list.23 July 2017 at 12:54 | Mark Forster - MrBacklog:
<< I can see the system is a bit like juggling 3 balls >>
Yes, that's a good way of putting it.23 July 2017 at 12:56 | Mark Forster - I spent one day using Real Autofocus and loved it! However, I have a project that requires large time blocks daily. Part of the reason I loved the process is because I didn't spend the necessary amount of time on this priority project. I am going to try rewarding myself with my RA list after completing a time block and will report back.23 July 2017 at 15:53 | Melanie Wilson
- It's not hard to implement next hour with this is it? I found out about next hour a while ago, and the focus it gave me was insane.23 July 2017 at 16:06 | Yoyorast
- Mark -
<< The way to avoid having too many tasks for DDD is not to put too many tasks on the list in the first place. >>
How do you do that in actual practice?
(You've already emphasized to start with a new list and let it grow naturally. My question assumes we've already done that but still need to control how much new stuff gets added to the list.)
I find that hard to do in practice with any catch-all system -- it's supposed to be a catch-all system, after all.23 July 2017 at 19:03 | Seraphim - After reading all these comments, it's clear that there is a mixture of new-system enthusiasm and issues/concerns developing already with list growth, backlog, anxiety over delete vs deferral, etc. As usual, several folks have ignored Mark's instruction to start with a fresh list.
Confession: I haven't tried it yet. I'm hesitating for two reasons:
(1) I prefer a synced app-based method (macOS & iOS), and haven't imagined how best to do it - seems better with a paper pad or notebook.
(2) I have inferred (perhaps incorrectly) that success with this system depends on being judicious about what one adds to the list, which seems antithetical to the catch-all nature of the AF systems in general.23 July 2017 at 19:27 | ubi - Seraphim:
What I have found with this system is that the effect of DDD on the day before yesterday has been to keep it in balance. In other words it has the psychological effect of causing me to restrict the amount of work I put on the list to what I can reasonably expect to do.
Of course it's perfectly possible to break the system if one really tries, which is why it's so important to build up gradually until one reaches equilibrium. As I've already said I find I tend to stay within the range of 40-45 tasks on the list at the end of the day, but to be doing 70-90 tasks in the course of the day.
<< it's supposed to be a catch-all system, after all. >>
Is it? I don't recall having said that. My description of it was high-speed, high volume, low resistance.23 July 2017 at 19:31 | Mark Forster - << Is it? I don't recall having said that. >>
It's in all the blog posts running up to the final one. For example, in the July 17th post:
<< Bear in mind that I was trying to find a way of processing a “catch-all” list without ending up with a huge number of tasks spread over many pages of notebook. >>
This seems to imply the system was intended to be a catch-all list. But you are right, you did not describe it that way in the actual system description. So I maybe I read too much into the run-up posts.
If that's the case, then it leads to another question. If it's not intended as a catch-all list, then what SHOULD it catch?
Based on your last response, I think the answer would be something like this: Start by putting everything that needs to get done. Over time, you will develop a better sense of what really needs to get done, and that's what you will put in the list, and this will happen naturally. So it is still intended to catch everything that needs to get done -- but your attitude toward this will change over the course of using the system.
Is that essentially what you mean?23 July 2017 at 20:39 | Seraphim - After working this system for a few days, I realized that the system pre-supposes that important tasks should be worked on at least every other day, or, if you want to keep the system in check without risking a lot of stuff on D-D-D, every day. You could tweak this by changing what you designate D-D-D, for example changing it to the day before the day before yesterday instead of the day before yesterday. Have you tried that, Mark? Or would it dilute important tasks too much?23 July 2017 at 21:25 | Nicole
- Like Seraphim, I was under the impression from the blog posts leading up to the instructions that this would be a catch-all system. I think I'm already in the process of breaking this system by overloading it with too much tasks that I can't possibly complete within the next few days. But as Seraphim also remarked, my attitude towards the system already changes while working it, making me reconsider when I put something on the list if that's really something I want/need/have to be doing within a few days.23 July 2017 at 21:30 | Nicole
- And to add to my previous comment about changing the time scale that's being designated D-D-D: that would boil down to juggling 4 balls instead of 3. Maybe not such a good idea...23 July 2017 at 21:32 | Nicole
- Nicole:
My interpretation is the system can handle a really long catch all list with ease.
If you work the system it will just result in a lot of tasks in deferral...
By scanning you should pick out urgent tasks naturally...23 July 2017 at 22:00 | MrBacklog - Ubi -
<<I prefer a synced app-based method>>
How long has it been since you used pen & paper? You might try it again for a few weeks. For years I forced myself to be (exclusively) phone/computer-based but caught the old-school bug a year ago and have found that a pen and notebook are not only efficient, but fun and flexible and they help me think. This system works really well with pen/notebook and I'm not having any trouble implementing it. (Deleting and Defering make my brain hurt, almost literally, but the payoff is so great I sort of enjoy doing them.)
<<I have inferred (perhaps incorrectly) that success with this system depends on being judicious about what one adds to the list>>
I would say this system *trains* one to be judicious about what one adds to the list.23 July 2017 at 22:42 | Zane - Seraphim:
<< Based on your last response, I think the answer would be something like this: Start by putting everything that needs to get done. Over time, you will develop a better sense of what really needs to get done, and that's what you will put in the list, and this will happen naturally. So it is still intended to catch everything that needs to get done -- but your attitude toward this will change over the course of using the system.
<< Is that essentially what you mean? >>
Yes, I think that sums it up very well.23 July 2017 at 22:49 | Mark Forster - Nicole:
<< You could tweak this by changing what you designate D-D-D, for example changing it to the day before the day before yesterday instead of the day before yesterday. Have you tried that, Mark? Or would it dilute important tasks too much? >>
No, I haven't tried it. My feeling is that the longer the period, the less effective it would be. In fact if I were going to change the number of days I think I would reduce them, i.e. yesterday and today only.23 July 2017 at 22:55 | Mark Forster - ubi:
<< I have inferred (perhaps incorrectly) that success with this system depends on being judicious about what one adds to the list, which seems antithetical to the catch-all nature of the AF systems in general. >>
I think I said somewhere that I was very surprised how this system worked out for me. I wasn't surprised that I got a lot done, nor was I surprised that I was able to clear the DDD list every day. What did surprise me was that I really didn't have to think about what I put on the list, and I was even more surprised how often I didn't have a DDD list to clear.23 July 2017 at 23:10 | Mark Forster - FWIW, I have implemented this new method using Things 3 synced across macs, iPad and iPhone. My working list is in the Today section. I'm still using tags and projects, but they don't seem that important at this point. Still early days, but it's going well for me.24 July 2017 at 1:02 | mcogilvie
- Zane asked: "How long has it been since you used pen & paper? You might try it again for a few weeks."
It's been a couple of years, I think. I may take your suggestion. I've been in a bit of a funk lately with various piles (backlogs) accumulating. Sometimes using apps & devices provides an illusion of productivity when it's really just a lot of futzing with tools & toys. I'm old enough to have learned that pencil-on-paper is best for thinking - e.g. in a meeting - and also less distracting than typing.
Has anyone implemented RealAutoFocus inside a FreeForm Notebook or Bullet Journal (i.e., interspersing the main task list with pages or blocks of unrelated content)? If I do convert back to analog, I would be tempted to do RAF that way.24 July 2017 at 1:55 | ubi - MrBacklog,
<<I can see this system could create quite long lists of deferred tasks. A robust system to handle deferred tasks would be great.>>
Earlier this year, I finally found a way to do this. I call it "sequencing," as opposed to "scheduling." For details, see the forum thread I just created:
The (maybe) Incredible "Timeless Calendar"
http://markforster.squarespace.com/forum/post/268143824 July 2017 at 3:21 | Bernie - Ubi - yes, I'm doing RAF in my bullet journal. I don't list tasks as bullets under each day's page. Instead I dedicate pages to tasks. When I reach the end of a task page I turn to the next empty page and continue there. (I do this with all pages - day, project, calendar, data, etc.) This is one reason I like RAF - the task list is physically short and always close to the page I'm on.24 July 2017 at 4:14 | Zane
- @mcogilvie: how do you implement this in Things-3? I've been working with Things on and off for the past couple of years, upgraded to Things-3 recently, but I find the Today list not flexible enough for most of Mark's systems. How do you distinguish between tasks from today, yesterday, or earlier? You could use due dates for that, but that kind off defeats the purpose of a real due date.24 July 2017 at 10:21 | Nicole
- Nicole, Ubi,
I've been using Remember the Milk, along with IFTTT, for this and it has been working great. I have the list sorted by date added, NEWEST on top. You can certainly do it with OLDEST on top, but I've always preferred NEWEST on top.
Any tasks that I add to my list at night, I like to count as the next day's task. So, each evening, at 7 PM (about when I pretty much stop doing and start relaxing) IFTTT sends a new task to RTM. The task shows as "=== Tasks added before <Date> 7 PM ===". That works as a great separator on my list.
So, the top group of tasks is my Today list. Any tasks I add immediately go to the top of that list.
The next group (below that line) is my Yesterday list.
The last group is my Day Before Yesterday list.
I use a smart list in RTM to include all tasks due today and then all undated tasks. The items due today (usually appointments - OR - tasks I've deferred to this day) show up first. They MUST get done today and show up ABOVE Today's list. I work on those throughout the day, along with Today and Yesterday.
Then, I move into my Day Before Yesterday list. Deleting moves them off the list, of course. Deferring also moves them off the list since they now have a due date and it is later than today. Then I just Do the remaining items on the list.
I've really been enjoying Mark's new system using this method.24 July 2017 at 14:09 | tomcal - At first do you make one pass through yesterday and today or do you keep on cycling through until you don't see anything else that you want to do at the moment?24 July 2017 at 16:12 | Mark H
- @Nicole: it's pretty simple to implement in Things 3. In addition to things I want to do, I have two marker items "-------" and "--------------------". Things defaults to putting new items at the top of the Today list rather than the bottom, so the list works backwards from the way Mark described it. I started on the first day with the markers at the bottom and my todos above them. The next morning, I moved the short marker to the end of the list. On the morning of the third day, I moved the long marker to the location of the short marker, and then the short marker to the end of the list. You could just do what you would do with paper instead: check off the old long marker, lengthen the short marker, and make a new short marker, but there's no need. I defer todos using the standard "When" feature of Things 3, and they show up at the top of Today list on that day, and of course I then put the long marker below them. Stuff from the Inbox as well as items marked "Today" in the Anytime section will also appear at the top of the list. So far, it's working very well. It's actually a bit scary.24 July 2017 at 17:12 | mcogilvie
- Starting a RealAF trial in a free-form bound pocket notebook (Field Notes Graph grid). Haven't done analog task management in a long time. Keeping a notebook open has an immediate quieting effect on mind. I'm much less tempted to "check" my devices all the time. I scan the notebook and contemplate what needs doing and noting. A slim pocket notebook isn't much of a burden to keep around - fits in the same shirt pocket with my iPhone.
Reading about folks' methods for implementing RealAF (or earlier systems) electronically is stressful; it brings up bad feelings of all the attempts I've made - with Things, Clear, Reminders, etc. - and sync-failure anxiety. Thanks again to Zane for suggesting paper & pencil!24 July 2017 at 18:37 | ubi - I'm going back to paper, too. I was generating too many tasks using OneNote. One specific thing I found myself doing was sending moderately difficult emails to the RAF list in OneNote rather than just pushing a little harder and getting the email completed immediately.24 July 2017 at 19:58 | Seraphim
- I am following it on Outlook, using due date to group and am loving it.24 July 2017 at 21:54 | vegheadjones
- MarkH:
<< At first do you make one pass through yesterday and today or do you keep on cycling through until you don't see anything else that you want to do at the moment? >>
The daily sequence is
1) one pass through yesterday and today treated as one
2) clear the DDD list (day before yesterday)
3) continue circling round yesterday and today (treated as one ) until close of work for the day24 July 2017 at 22:08 | Mark Forster - This new system is brilliant, Mark! I love this algorithm for guiding my workflow. Cheers!24 July 2017 at 22:41 | David Drake aka Longstreet
- David:
Good to hear from you again, David. I hope it continues to work for you.25 July 2017 at 0:18 | Mark Forster - Wonderful new system, Mark, very powerful. For me its like the focus and flexibility of a no-list system combined with the thoroughness of a catch all system. For me the reason it works so well is DDD. I remember back in the AF1 days you used to emphasize the importance of dismissal. I think your new method represents an amazing enhancement of the dismissal process.25 July 2017 at 1:29 | Paul MacNeil
- I'm also doing this analog at work (via the ol' marble composition book) and at home (Field Notes, kept in my back pocket).
For work, I had previously invested a lot of time in the Linenberger system where the inbox is customized with an Outlook Tasks window that is customized to show hi/med/lo tasks. Creating tasks from emails is dead easy with this method.
But funny thing...The company upgraded my laptop so they had to take my old laptop away and give me a loaner, so I was without my customized Outlook for a couple days. I had to access my email via the Outlook web interface -- which doesn't support the custom outlook views.
In the interim, I started an RAF list. When I got the new laptop, all of my emails were there, of course -- but none of the Outlook task window customizations.
I chose not to go through the effort of doing all that customizing again. It just proved to me yet again that digital systems, for all their marvels, can be brittle and crumble quickly. (I also set up Linenberger's system for Toodledo, but I don't find the interface appealing and have never gone back to it after setting it up.)
Pen and paper to the rescue! Just pausing for a few beats to write something down offers time for a little reflection, something I never did when dashing off new tasks.
Though my manager threw a task at me after lunch today that basically wiped out my afternoon, such that I never finished a round through yesterday and today and did not get to the DDD. So I will pretend like yesterday did not happen, and start again.25 July 2017 at 3:06 | Mike Brown - @mcogilvie
Thanks for the tip on using Things 3, I got it because of the ease of duplicating and reentering tasks.
@Zane
Thanks as well, I tried doing RAF in my Bullet Journal, but made a mess. A separate task page makes total sense.
I am wobbling between the two right now, but I want to give these two new ideas a chance.26 July 2017 at 1:05 | Erin - Perhaps I've missed something in the comments and replies, but I still think the weakness in this otherwise intriguing idea lies in the deferral process. It seems to me that one shoves deferrable jobs into arbitrarily-selected calendar slots. There no rule for it. Then there's the possibility that one's calendar get clogged up with tasks that by definition defied doing earlier.
I must admit, moreover, that I always liked David Allen's 'hard-landscape' rule for the calendar.26 July 2017 at 2:24 | Martin Williams - Hello! I do not speak English, the translation was done by Google. Please forgive me.
I want to share how I implemented the system with the help of "Remember The Milk"
I created 2 smart lists with the conditions:
1. due:today OR due:yesterday . I named this list "Autofocus"
2. dueBefore:yesterday OR due:never. I named this list "DELETE DEFER DO".
In the settings of the program is the option "Default Due Date - "Today ".
When I look through the "DDD" list, the tasks that need to be postponed I set the "Today" date. They are automatically transferred to the end of the "Autofocus" list.
I'm testing the second day, the system works fine. It only needs 2 lists, which is very good.26 July 2017 at 2:55 | Vladimir - A concise way to look at RAF at the beginning of the day...
1. draw the line
2. one pass below the line
3. DDD above the line
4. the rest of the day below the line26 July 2017 at 4:33 | Zane - @Martin Williams
Try following the rules faithfully for a week and I think you'll find your DEFER rule will write itself. Trial and error will teach you not to clog your calendar.26 July 2017 at 4:43 | Zane - Zane,
Thanks for the concise 4-step summary. But your Step 4 - "the rest of the day below the line" - is unnecessary since everything above the line was already crossed out in Step 3. ;-]27 July 2017 at 1:57 | ubi - Today was DDD day and it was not very pleasant :). I had 6 tasks undone, all urgent and important and none could be subject to DDD treatment. They all had to be done. I had no choice. I rewrote them to the bottom of the list without working on them due to time constraints.
Out of that predicament I realised the following:
a. I was not doing the right tasks in the course of my day; and/or
b. I may have taken on too many tasks;
The system has been a revelation. What I should be doing more of, where I am spending too much time, and how much capacity I have.
I can't ask for anything more in system of task and time management. This simple system provides an incredible level of breath and depth in feedback.
Thank you Mark, this must be your best work yet.27 July 2017 at 16:27 | JD - I was wondering if this new system is quite similar to and earlier system Do It Tomorrow?
I remember one comment that the DIT system was too exacting for some.
I can see RAF working fine and dandy when kept up to date and minimal DDD.
But if backlogs or lots of deferral, then it might fall apart - or too difficult to control and keep track of the deferred tasks in the calendar?
I always loved DIT, but I found it just too productive and tired me out all the time. I seemed to work my socks off to keep up with clearing everything that came in!27 July 2017 at 17:51 | MrBacklog - @mcogilvie
Thank you for your insights on how to implement RAF in Things 3.
I had been trying to figure out how to handle this in Things 3 and I was not seeing how to do it.
What you suggested works very well. I have been using this approach in Things 3 since Monday.
The When function is very fast for the DEFER step. The When functionality and the powerful repeat functionality adds tasks to the above the line Today section without having to look at a Calendar and copy them.
Thanks again.27 July 2017 at 21:24 | Stuart Tattum - I just noticed that google calendar reminders work really well with this system.29 July 2017 at 10:30 | Yoyorast
- Still working well after 16 days which is very encouraging.
The only wrinkle I have added is to mark "waiting for" items with a capital W and allow those to remain longer than the deadline and then carry them forward once followed up.
This is because I would not always follow up inside 2 / 3 days and scheduling them was awkward.4 August 2017 at 16:31 | Mike - Hi Mark, thank you for this new system. I've been experimenting it for a while now and I can say it works very well as a processing system.
However, after some experiments, there is a concern I have which I want to share.
This is a bottom-up system, that is it allows to capture stuff that you are going to do over the next two days. Some of these actions may be connected to larger and important projects, but the risk is to 'flood' it with relatively low-important and low-resistance stuff. In other words, this system may become extremely effective at processing trivia. To me this was the main weakness too of all of your previous systems.
The solution would be to have a companion top-down system to keep track of projects in order to make decisions about the scheduling of highly important stuff that will be likely to get processed with the RAF, along with all the rest.
The only method of the kind that I have seen in your blog was the spinning plates. However, it didn't worked for me as a stand alone method. The main difficulty for me was to apply the "little and often" method, as my working days are really quite different from one another.
However, I will try to use both methods together over the next 10 days to see what happens.
in the meantime I was wondering whether you have other ideas in the pipeline regarding the management of projects...
Cheers9 August 2017 at 8:25 | Fabio - Fabio:
<< Some of these actions may be connected to larger and important projects, but the risk is to 'flood' it with relatively low-important and low-resistance stuff. >>
The mistake here is to equate "low-importance" with "low-resistance". They are not the same thing. Unfortunately most project management systems tend to reinforce this faulty perception.
In the majority of my systems on the other hand I am aiming to reduce the resistance of high importance tasks so that most of the time you are processing high importance low resistance tasks.
Of course if you fill a task management system with low importance items, then that is what it will process. And if you fill a project management system with low importance projects, you will get exactly the same result.
The secret is not to put low importance stuff on your list in the first place. Or failing that, to weed it out quickly and ruthlessly..9 August 2017 at 16:41 | Mark Forster - Hi Mark and Fabio -
I raised similar concerns here
http://markforster.squarespace.com/blog/2017/6/25/thoughts-on-the-long-list-2.html#comment21753738
Mark gave some good answers, but I wasn't really satisfied with them, and wasn't sure how to articulate why. I'll try to give it another shot in that thread.9 August 2017 at 20:39 | Seraphim - Seraphim:
I'm looking forward to reading your further thoughts.9 August 2017 at 22:51 | Mark Forster - Mark:
<<The secret is not to put low importance stuff on your list in the first place. Or failing that, to weed it out quickly and ruthlessly..>>
Mark, my question is: how will you know that something is low-importance?
To me, I can say something is low-importance only in comparison to something that I believe to be more important in that specific time and space frame of reference.
In other words, importance of a task (or project, or whatever) is never an absolute concept, but a relative one. And the position of a task in this personal "importance scale" relatively to other tasks may also changes relatively to time and space. For instance, something that is very important now, may be absolutely unimportant tomorrow or in a place different from the one I am writing from now.
Therefore, what is still missing to me is a companion system, separate from the processing system, that will help us to reassess, quickly, creatively and on a regular basis, the importance of the stuff that is on our plate at any given moment and place. This system should help us to keep the focus constantly on what is located high in our personal importance scale, making it less vulnerable to external events that may distract us and cause a loss of focus.
Then, to choose what to put in the RAF (that, by the way, I think is the best of your processing system so far) will be very easy. And, at the same time, to have a clear and updated picture in mind of what is important now will reduce the chances that any kind of garbage that comes in along the day (especially the very urgent but low-importance ones) will be put reactively in the system to be processed.
I hope that I managed to speak my mind clearly.10 August 2017 at 14:23 | Fabio - Fabio:
I use Mark's suggestion of a commitments list to track all the mid to high level commitments I make or that are made for me at work. I phrase these commitments as projects, but sometimes they're more terse.
I keep the list in Evernote and have an automatic reminder set to review it every 2 weeks. At that point, I edit the list by bumping some projects "above the line" and moving lower priority projects "below the line." And reviewing the list may spark ideas for tasks.
I am not sure that this addresses your question. The best I can manage is to list what I think is important and review the list regularly in light of what time and Future Me judge to be still worthwhile.10 August 2017 at 15:13 | Mike Brown - Seraphim and Mark,
I read Seraphim's post where he was expressing concerns similar to mine.
What Seraphim described is rather known to me. When I am under pressure and there is a lot of new stuff coming in (maybe I am under stress also because of a lot of
stuff coming in), regardless of the system used, I tend to follow the path of least resistance. And I have noted that this is directly proportional to the amount of external pressure. So the higher the external pressure, the higher the tendency to shift away from the important stuff.
Being a Neurologist and being involved in clinical Neuropsychology I couldn't help comparing this kind of temporary behaviour to that of some persons with lesions of the so-called Supplementary Motor Area (SMA) which is located on the inner (mesial) surface of the frontal lobes, which in Humans are the planning and executive centers of the brain.
When there is a lesion of the SMA, there may be an imbalance in favour of another area called Pre-Motor Area (PMA) which is located on the external surfaces of frontal lobes.
PMA seems to be important to initiate actions triggered by external stimuli (like vision, hearing, etc - external drive system), whereas SMA seems more important to initiate actions on the basis of internal stimuli (i.e. visual imagery, thoughts, etc - internal drive system).
Normally the two areas are somehow in balance, so that we can start a course of action on the basis of we have imagined/planned in advance, thus the inner drive system (SMA) is prevailing. However, the plan can be updated-changed on the basis of an analysis of the external situation, so that the external drive system (PMA) can help making the needed adjustments to the original plan. The net result (behaviour) is the outcome of the continuous balancing between the internal
and external drive systems.
Although I have oversimplified the model, this is a very complex system that involves other important areas than the SMA and the PMA within the frontal lobes (by the way, there are two brain hemispheres, so that we all have two SMAs and two PMAs). Indeed the so called executive functions of the brain (including the two drive system described above and other important functions) require other important areas and neuropsychological functions to cooperate, such as working memory (a form of very brief short-term memory), long-term memory, prospectic memory (that form of memory that allow us to remember doing something at a specific time in the future), emotions, and, of course, the various forms of attention. The latter is particularly important as it is the neural foundation of the ability to select (and discard unimportant) information in order to safeguard us from being helplessly immobilised into a standstill because of a flood of competing response demands.
When there is a lesion of the SMA, individuals become enslaved by external stimuli, so that they do not only lose the ability to plan, but they develop an urge to act on external stimuli, actually becoming
dependent on the external environment. They actually have extreme difficulties in inhibiting behaviours triggered by external clues, even if those behaviours are socially inappropriate. For instance, if they see some food they can reach out for it and eat it, not because they are hungry, but just because "the food was there".
By looking at my own behaviour under stress, maybe because of mental tiredness, loss of focus or, maybe, transitory memory malfunctioning or whatever, I have seen that my acting behaviour may be more prone to be influenced by external
demands (even trivial or relatively unimportant ones in comparison to my own pre-planned important goals), probably because stress moves the balance in favour of the external drive system (PMA overactive and/or SMA under active).
I have also noticed, that this happens to a lesser extent when I took the chance to "pre-load" into my own memory the plan for the day or, maybe better, those 3-4 main goals for the day and keep them afresh by recalling them (visually AND verbally) from time to time during the day. This gives me a sense of "calmness" and of being more in control that, probably derives from a better balance between the two drive systems in favour of the
inner one (SMA). It was like the formers would become better able to "filter" the information coming in from the environment, reducing the information "noise", thus allowing to keep the "inner" plan in focus.
This is, for instance, the main reason why, after many years, I have abandoned electronic means in favour of a more traditional pen and paper approach, as the act of writing (and, especially, rewriting) is, in itself, a memory aid.
In summary, in my experience, using only an executive device such as RAF (or its antecedent, like FV, SF, AF and the alike) may not be effective at reducing the risk of a takeover by the external drive system under stress.
On the other hand, the use of an executive device along with a companion system designed to reinforce the internal drive system by keeping the plan (or the projects) under regular (and quick) revision could help, under unfavourable
circumstances (i.e. stress), to keep the external and the internal drive systems in better balance.
Sorry for the length of the post, I hope that I haven't bored you to death too much... :-)11 August 2017 at 21:55 | Fabio - Hi Mike,
for the reasons explained in the post above, to make a review of the list of commitments (or projects) every two
weeks would be absolutely ineffective, unless you were able (and I am not) to keep that list afresh in your memory day by day. In this case, though, probably you wouldn't need to keep it in writing.
What I am saying is that if we all had, constantly loaded in our own memory, moment after moment, a list of our priorities, we would have less chances to get distracted from the supposed external urgencies and, thus, less prone to loss focus and to procrastinate.
However, for me this is not the case. Mark's previous system "the next hour of our life" for me was a complete disaster simply because I often could not remember the important stuff to be done, but only the external supposed urgencies, in view of the so-called "recency effect" of the memory (we tend to remember better things occurred closer rather than farther in time).
Thus, what I would like to use is a system that can be quickly reviewed several times a day to "refocus" on the priorities and quickly rebalance the external and the internal drive system in favour of the latter.
In this respect, RAF is an important advancement in comparison to the systems based on long catch-all list, because of the built-in two-days dismissal system, which inevitably forces to review what has not been done.11 August 2017 at 22:27 | Fabio - Hi Fabio - thanks for a fascinating post, very interesting, and relevant to all systems of time and life management. As far as RAF is concerned, you could have a recurring task "Review list of projects/commitments" .12 August 2017 at 21:30 | Margaret1
- Fabio - how many projects/commitments are you talking about?12 August 2017 at 23:13 | Zane
- Fabio:
Thanks for a very interesting post. As others have said, I've always recommended keeping a list of "authorized projects", but I tend to take such things as read when describing a new system.13 August 2017 at 9:53 | Mark Forster - Fabio, thanks for these great posts. The neurology is very interesting and it seems to explain a lot of my own experience.27 August 2017 at 19:39 | Seraphim
- Mark, could you elaborate on how you use the "authorized project list" in actual practice?
You discuss a similar "authorized list of commitments" in the Secrets book (ch. 20, p. 124).
And you wrote about it here last year - http://markforster.squarespace.com/blog/2016/2/20/authorised-projects-list.html
The principles all make sense -- it's the actual practice that I'm wondering about. It's not clear to me how you work this into your routine.27 August 2017 at 19:42 | Seraphim - I find that starting the day with an outline of commitments (I use OneNote, but a paper mind map would be as good) sometimes helps. And only takes a few minutes.7 September 2017 at 9:12 | Will
- @Fabio,
<< On the other hand, the use of an executive device along with a companion system designed to reinforce the internal drive system by keeping the plan (or the projects) under regular (and quick) revision could help, under unfavourable circumstances (i.e. stress), to keep the external and the internal drive systems in better balance. >>
I like Cal Newport's idea of following a "Project Completion-centric" approach, by having an Active Project list. This is a list of your 6-12 of the most important projects in your life, which you review regularly (daily) and focus intensely on completing.
As Cal Newport says, every morning you look at your Active Projects page and ask: "What's the most progress I can make toward completing this list today?"
Then, you can add the tasks generated through this daily process to your RAF list for the day and use Mark's tools for getting the actual day-to-day tasks completed.
This ensures (1) that you are frequently reviewing your most important projects, such that they are always in front-row during your planning, ensuring they are completed timely and (2) you are getting the actions necessary to complete them done, through a proven method, avoiding procrastination etc.
More details about the "Active Projects" list:
http://www.scotthyoung.com/blog/2007/10/18/the-art-of-the-finish-how-to-go-from-busy-to-accomplished/
A key element of this approach is to have few select "Active Projects" and focusing intensely on completing them, before taking on more.
More about this idea here:
http://calnewport.com/blog/2007/10/10/the-einstein-principle-accomplish-more-by-doing-less/
Loukas7 September 2017 at 9:19 | Loukas - In a similar vein to what @Loukas wrote, you can also control the RAF task list length by having a set number of roles (Steven Covey, 7 Habits) or a six-box to-do list (Peter Bregman, 18 Minutes) and making sure that the RAF task list is populated only by 1-3 tasks from each role/box. Using the Bregman-based approach has helped (?forced?) me keep the task list to a manageable length, on a daily basis.
Otherwise, the RAF approach has been a massive gamechanger for me - thank you Mark!12 September 2017 at 13:36 | Bernard - Crunch time. Got some actions in DDD which aren't standing out for me. Partly because I dragged them from my inbox in my customised outlook setup. Partly because I use a humorous scary script for the DDD (8 pt Showcard Gothic, since you ask). Partly because I'm swamped.
So, is this the moment to go back to the beloved Moleskine?
On reflection, no: it is exactly NOT the moment to change the system. Though I might change the font.
Will.13 September 2017 at 10:00 | Will - It's funny how sometimes tiny details make a big difference, like your choice of font, or my choice of notebook shape and pen. The right one feels good to use, and the wrong one feels a pain to use. (For me, right is Mead Cambridge 80 sheets 20x12cm, with a dualcoil binding and a pen that slips neatly into that coil.)16 September 2017 at 18:49 | Alan Baljeu
- Hi Mark,
Thank you so much for your posts, systems and insights which are really helping me to avoid things like "analysis paralysis" and not knowing what to do when I have large blocks of unstructured time in between scheduled events or appointments.
With that said, I have begun implementing Real Autofocus in my daily work, but I have a question regarding Step 4 on Subsequent Days. It says:
You now work only on the tasks between the beginning of the active list and the long horizontal line you drew at the beginning of the day:
Scan them and DELETE any you no longer want to do at all
Scan again and DEFER any you don’t want to do now to your schedule/calendar (do not just re-write them at the end of the list without taking any action on them)
DO all the remaining tasks in order
When you say "do the remaining tasks in order", does that mean you need to finish them then and there? Or can you simply do some work on each (i.e. just make some progress) and then cross them off and re-enter them at the bottom of the list if they are still unfinished? (In other words, transfer them from "older" tasks to "still active" tasks.)
As a musician I tend to have quite a few medium- to long-term projects (writing music, practice etc.) on the go at once (running from tens to hundreds of hours of work) which can become organisational behemoths if I don't keep on top of them, but I may or may not be able to work on every project every day (due to my work often taking so many hours each day that I can only manage one or two musical projects per day out of the many), but still want to keep everything ticking over on a regular basis, as well as having time for personal projects and non-music related work or study. How does one manage something on this level?
I like the autofocus system as a way of managing my work according to my energy level and intuition, but how can I keep track of which tasks are part of a project or have been broken down into smaller tasks from a bigger one? I used to use a GTD system for this purpose but the downside was that I ended up doing far more organising than doing, and really not making an efficient use of my time, as I was putting off tasks due to not managing my energy levels well, tending to leave big tasks until far too late in the day to do anything meaningful about them. Thankfully, autofocus has redressed the balance somewhat but sometimes it's still difficult to see the forest for the trees. What might you suggest to deal with this?28 September 2017 at 0:08 | Ashley - Ashley:
<< When you say "do the remaining tasks in order", does that mean you need to finish them then and there? >>
No
<< Or can you simply do some work on each (i.e. just make some progress) and then cross them off and re-enter them at the bottom of the list if they are still unfinished? >>
Yes
<< As a musician I tend to have quite a few medium- to long-term projects .. How does one manage something on this level? >>
Keep a separate list of all your music projects. On your to-do list have a task "Music Projects". Each time you select that task for action, choose one project off the music-projects list and work on that. When you have worked on it for as long as you want to, re-enter it on the music-projects list. Then go back to the main to-do list.
<< How can I keep track of which tasks are part of a project or have been broken down into smaller tasks from a bigger one? >>
Similar answer to the music projects question: keep separate lists of actions for each project, and enter the project name on the main to-do list rather than individual actions.28 September 2017 at 13:41 | Mark Forster - "re-enter it on the music-projects list. Then go back to the main to-do list."
What do you mean by this exactly? For example, if I've worked on "Music-projects" today for an hour or two, should I check it as completed, and enter "Music projects" again for tomorrow's list? (Since they're probably big projects and require daily work and focus).11 October 2017 at 16:54 | Yoyorast - Yoyorast:
<< if I've worked on "Music-projects" today for an hour or two, should I check it as completed, and enter "Music projects" again for tomorrow's list? >>
We're talking about Real Autofocus. There's no such thing as "tomorrow's list" in this system. You just write it at the bottom of the list. You may want to work on it more than once in the same day.11 October 2017 at 17:36 | Mark Forster - Yeah, I meant day 2.
Anyways, I really love this system. It's great for becoming disciplined across lots of areas in your life. As you can enter anything that crosses your mind, focus on the important things, also, being able to see tasks you've completed really gives me focus, lots of energy, and motivation to get more and more stuff done. It feels like it's all being gamified (thanks to the weeding out rules) and that I'm a robot now. Lol.11 October 2017 at 18:06 | Yoyorast - Hi again Mark,
Thank you for your previous reply. In the time since I last posted, I've tried out some of your other methods (some other autofocus variants, DWM2 and a couple of "no-list" ones) and I always seem to find myself coming back to RAF as my weapon of choice for getting things done.
Now, instead of staring at a long list and wondering about priorities, how much time something will take, what to get started on and when, etc., RAF really alleviates the pressure I feel on a daily basis to actually get my brain started on focusing on work when my day begins, and after breaks in my day. I can just start my day by picking anything I feel like doing, and simply work on it for 5 minutes to kick-start myself. After that inertia is overcome, it's a lot easier for me to continue working.
With that said, I have a quick question.
You wrote in the main post in the SUBSEQUENT DAYS heading, under step 4:
You now work only on the tasks between the beginning of the active list and the long horizontal line you drew at the beginning of the day:
Scan them and DELETE any you no longer want to do at all
Scan again and DEFER any you don’t want to do now to your schedule/calendar (do not just re-write them at the end of the list without taking any action on them)
DO all the remaining tasks in order
Continue working the rest of the list as in rules 2-5 for the first day.
My question refers to the DEFER step, specifically to the "do not just re-write them at the end of the list without taking any action on them" part. If you have written something on your list that is actually more than one actionable step, or a "mini-project", is it OK to cross it out and rewrite it at the end of your list if you rephrase it in a way that makes it more actionable (for example, clarifying what is the first step in the process of doing that big task that is due for deferral). Does rephrasing a task in this way (breaking down a task into smaller chunks or the next actionable step) count as "taking action" on that task? Or must "action" constitute something more concrete than simply rephrasing a task?
Thanks for your time and help.
Ashley5 December 2017 at 17:10 | Ashley - Ashley:
<< If you have written something on your list that is actually more than one actionable step, or a "mini-project", is it OK to cross it out and rewrite it at the end of your list if you rephrase it in a way that makes it more actionable >>
If it works for you, then it's OK.
What you need to avoid is endless re-circulation of tasks without doing any action on them. That's why I don't generally advise deferring tasks to the end of the list. But if you are satisfied that this will make it easier for you to do the task, then go ahead. If you find it doesn't work out that way, then you can have a rethink.6 December 2017 at 13:23 | Mark Forster - I have been learning this system for about a year now and reading all the posts. This is my first time commenting. Mark Forster, I love your system!
I used David Allen's technique for 20 years and never felt like I was doing it right. The AF system has been a revelation in that it combines intuition and a failsafe process.
This most recent RA iteration is the best for me. Here's one way to adapt it to an electronic system. I used to use Omnifocus, but now I use the "Things" app, which I find to be elegant and simple.
(btw, I capture tasks a few ways - via typing in the inbox, via emailing into "Things," and using Siri: "in 'things,' remind me to take out the trash." "'take out the trash' added to your inbox list!"
I created three "areas" in things: Today, Yesterday and Day Before Yesterday.
Then, I do your RA steps this way (this is starting w/ Day 3):
1. Work on “Yesterday.” When you reach the end of the list, go to “Day before yesterday.".
1. Scan them and DELETE any you no longer want to do at all
2. Scan again and DEFER any you don’t want to do now to your schedule/calendar (do not just re-write them at the end of the list without taking any action on them)
3. DO all the remaining tasks in order
2. Continue working:
3. Add other tasks to the inbox as needed or as they occur to you throughout the day. Allow the list to build up gradually.
4. Work the 3 lists (today, yesterday, inbox) by scanning, taking action on those tasks that feel ready to be worked on.
5. When you’ve worked enough on a task. cross it out. If it’s unfinished, re-write it into the inbox. Do the same with tasks that will recur the same day or the next day.
6. When you finish for the day, move “yesterday” tasks to “day before yesterday,” “today” tasks to “yesterday” and “inbox” to “today."
I also have Areas for larger projects, and I make sure that one of my "to do"s is always "look at x project for next task."
In a nod to GTD, I also created a "waiting" area, for tasks I can't act on until I or someone else does something. "Check @wating" is one of my regular tasks.
And in another nod to GTD, I have an "Agendas" area, where I keep tasks related to specific important people, with a corresponding "check X agenda for tasks" item on my to do list. That way if I have a meeting or phone call w/ someone, I've got all the things I wanted to talk to them about in the same place.3 February 2019 at 17:52 | R. Perry - I remember using RAF a few years ago on paper and I didn't get quite into it because of how disruptive the "three D's" were compared to how the other Long Lists, as well as I disliked the mixing of soft self-imposed deadlines with hard external deadlines that I record in my calendar.6 February 2019 at 15:11 | nuntym
- I've recently picked up RAF again, after a spell of switching systems too frequently – simple scanning, NLFVP, 5T, … . It would be rash to say I'll stick with it for a long time, but at the moment I'm liking having a catch-all list that doesn't run out of control.
Chris6 February 2019 at 17:53 | Chris Cooper - R. Perry
Do I understand that in step 1 you work on Yesterday first, not Today? When do you work on today if new items go into the In box?
Thanks for sharing your set up.7 February 2019 at 5:11 | Erin - Hi, Erin - yes, that's right. It's the best way I've come up with of duplicating the pen and paper method electronically because Things doesn't automatically put newest tasks on the bottom of each list.7 February 2019 at 5:15 | R. Perry
- Sorry - let me clarify a little more, Erin. "Today" and "Inbox" are both technically "Today." But because I generally input tasks via Siri, which puts what I dictate directly in the Inbox, I use the Inbox to add all the things to the "Today" list that I think of as I'm working throughout the day.7 February 2019 at 15:10 | R. Perry
- Thanks, R. Perry, that’s what I didn’t understand was Inbox and Today. Today is an area not the built in Today? When I read Mark’s rules again I saw how Today worked in the cycle.7 February 2019 at 15:28 | Erin
- Yes, Erin, I'm using "inbox" and "today" in the places in Mark's system where he refers to "today." It's just that I'm only adding new tasks to the "inbox" portion of it, since that's how it works with Siri.7 February 2019 at 20:59 | R. Perry
- I still use this system (sporadically) after several years, and was trying to recall the original instructions, regarding dismissal, by searching this site. I even forgot what the R stood for! It seems that this system never got entered on the TM Systems tab at the top. I think this was the original entry - perhaps Mark can create a link from the TM Systems tab . . .24 August 2021 at 13:34 | ubi
- This seems like an excellent system. In thinking of any possible drawbacks, I have hit upon the following:
When you are clearing your delete, defer, do’s (DDDs), there may be urgent tasks clamouring for your attention. Obviously, the rule that allows for one pass through yesterday and today's tasks before the DDDs is meant to help with that. But it may not solve the problem.
Three potential solutions cross my mind:
1. Use to “do it now” rule to respond to the urgent tasks; or
2. Make sure that your DDD tasks are kept to minimum the day prior so that you won’t have a large backlog to clear while urgent tasks are coming in; or
3. Relax the DDD rule so that you only need to clear the DDDs by the end of the day, not in one go.
There are probably other solutions. And maybe I have exaggerated in my mind the extent to which this is a problem. I would welcome any thoughts on this.3 October 2022 at 17:57 | Belacqua - I seem to have stumbled upon a possible solution to this issue, as posted here: http://markforster.squarespace.com/forum/post/279158712 October 2022 at 13:42 | Belacqua
- Basically, DWM2 with 2-day dismissal is similar to solution 3 above. Every day, you get the whole day to clear all items from the day before yesterday--rather than having to clear them all in one go, as in the original Real Autofocus. Having the whole day seems a lot more flexible because urgent tasks will be coming in.
However, the original Real Autofocus may be better if it leads to solution 2 above: every day, you end up clearing most of yesterday's tasks, leaving very few DDDs to the following day.
Whatever is best, I'm attracted to this combination of Simple Scanning's flexibility + a time limit for the tasks so that you get moving on them. These features are common to Real Autofocus and DWM.14 October 2022 at 15:55 | Belacqua